Skip to main content

Long Stem Lights Rewiring

Volunteer and retired Electrician Ed Kurbis rewired the 16 original long stem lights in the Great Hall (locomotive Bays 1-5).  This was a huge job with over 80 hours of work that involved taking the lights down, rewiring, rehanging, pulling wire, etc., and determining the ideal lighting controls on the electrical panel. They look amazing! Also, use of the man-lift was donated by Venture Fabrication Ltd, Hanna, for over 30 hours of use! What a HUGE help with the donated labor and equipment use, this work was able to be done. The Hanna Roundhouse Society could NOT have done this work without the help of these 2 amazing people!

Thank you to Ed Kurbis and Venture Fabrication Ltd.!